Metro’s Monday evening commute is winding down with no significant delays or disruptions in transit service to report.
The Evergreen Point Bridge P&R on SR-520 has moved
As of 7/25/11, the Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.
- This location will be used for about two years to allow for construction
of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project. - The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Rd & NE 32nd St in Medina.
- Capacity at the temporary lot is reduced from 50 to 19 stalls.
- When the new P&R opens in 2013, the 50 stall capacity will be restored.
The Mt Baker Link Station elevator to & from the southbound platform is out of service. The northbound platform elevator is operating.
- Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
- Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train back to Mt Baker.
We will return at 6:00 AM Tuesday morning to help keep an
Eye on Your Metro Commute.
Travel safely and have a great evening.