Daily Archives: September 6, 2011

Metro’s Tuesday PM commute is winding down with Route 331 still rerouted in Richmond Beach, plus construction & events

Metro’s Tuesday afternoon commute is ending with traffic congestion cleared in nearly all areas.

Route 331 is still rerouted via Dayton Av N in Richmond Beach north of 195th St due to an accident on 200th St east of 3rd Av NW.

Mariners home stand
starts Thursday, 9/8 at 7:10 PM.
Traffic in the SODO, Stadium, Pioneer Square & downtown Seattle
areas may be congested on game days. Ride transit to the game.

The Evergreen Point BridgeP&R on SR-520 has moved
As of July 25, Metro Transit’s Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.

  • This location will be used for about two years to allow for construction
    of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project.
  • The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Rd & NE 32nd St in Medina.
  • Capacity at the temporary lot is reduced from 50 to 19 stalls.
  • When the new P&R opens in 2013, the 50 stall capacity will be restored.

The Mt Baker Link Station elevator to & from the southbound platform is out of service.  The northbound platform elevator is operating.

  • Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
  • Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train back to Mt Baker.

We’ll be back Wednesday morning at 6:00 to help keep an Eye on Your Metro Commute.

Travel safely and have a great evening.

Expect heavy congestion on the West Seattle Freeway to downtown Seattle

Routes 21, 22, 37, 54, 55, 56, 57, 120 & 125 -

Expect heavy congestion on the West Seattle freeway due to traffic.

Thank you for your patience.

Metro’s Tuesday AM commute begins quietly

Metro’s Tuesday morning commute begins quietly with no significant delays or disruptions in transit service to report.

Evergreen Point Bridge P&R on SR-520 has been moved to a new temporary location
As of July 25, Metro Transit’s Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.

  • This location will be used for about two years to allow for construction
    of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project.
  • The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Road & NE 32nd St in Medina.
  • Capacity at the temporary lot is reduced from 50 to 19 stalls.
  • When the new P&R opens in 2013, the 50 stall capacity will be restored.

The Mt Baker Link Station elevator to & from the southbound platform is out of service.  The northbound platform elevator is operating.

  • Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
  • Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train.

We will be here until 9:00 AM to help keep an Eye on Your Metro Commute.

Travel safely and have a great morning.