Metro’s Friday PM commute wrap up; Mariners game tonight 7:10 PM at Safeco Field, new Burien P&R garage opens Saturday, plus upcoming construction and events that may impact service

Metro’s Friday evening commute is winding down with no significant delays or disruptions in transit service to report.

Please note the information below about other service impacts in Metro’s service area.

Construction on Wallingford Av N between N 80th St and N 85th St

Mariners game tonight, Friday, August 26, 7:10 PM at Safeco Field
Traffic in the SODO, Stadium, Pioneer Square & downtown Seattle areas may be congested on game days.  Ride transit to the game.

SR-520 Evergreen Point Bridge – full weekend closure

The new Burien P&R garage opens on Saturday, August 27

  • The new 5 story, 460 space garage is on the west side of the Burien TC.
  • The Interim Burien P&R at 14650 1st Av S & the Burien Municipal Parking Lot will close on Saturday.

68th Av S will be closed at S 212th St

Seattle Marathon 10K

Enumclaw Motorcycle Show 

Sounders FC game Saturday, August 27 – 1:00 PM at CenturyLink Field
Although no Metro or Metro operated Sound Transit service is rerouted because of this event, expect possible delays due to traffic volumes in the SODO, Stadium, Pioneer Square & downtown Seattle areas.

Mariners game Saturday, August 27, 7:10 PM at Safeco Field
Traffic in the SODO, Stadium, Pioneer Square & downtown Seattle areas may be congested on game days.  Ride transit to the game.

Bothell RiverFest

Eastbound SW Spokane St at 26th Av SW will be closed

Mariners game Sunday, August 28, 1:10 PM at Safeco Field
Although no Metro or Metro operated Sound Transit service is rerouted because of this event, expect possible delays due to traffic volumes in the SODO, Stadium, Pioneer Square & downtown Seattle areas.

S 317th St between 23rd Av S and 28th Av S will be closed

Northbound Westlake Av N between Mercer St and Valley St
will be closed

Evergreen Point Bridge P&R on SR-520 has been moved to a new temporary location
As of July 25, Metro Transit’s Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.

  • This location will be used for about two years to allow for construction
    of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project.
  • The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Road & NE 32nd St inMedina.
  • Capacity at the temporary lot is reduced from 50 to 19 stalls.
  • When the new P&R opens in 2013, the 50 stall capacity will be restored.

The Mt Baker Link Station elevator to & from the southbound platform is out of service.  The northbound platform elevator is operating.

  • Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
  • Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train.

Thank you for joining us today.

We will return at 6:00 AM on Monday to help keep an
Eye on Your Metro Commute.

Travel safely and have a great weekend!

UPDATE – Blockage on eastbound I-90 at the Front St exit has been cleared.

The blockage on eastbound I-90 at the Front St exit has been cleared.  Metro Routes 214, 215, 216, 218, 271 and ST 554, ST 555 & ST 556 are experiencing delays as traffic congestion begins to clear.

Thanks for riding and for using Metro’s services.

Expect delays on eastbound I-90 due to an incident at the Front St exit

Metro routes 214, 215, 216, 218, 271 and ST 554, ST 555 & ST 556 are experiencing delays on eastbound I-90 due to an incident at the Front St exit.

Thanks for riding and using Metro’s services.

Metro’s Friday afternoon commute is underway; the new Burien P&R garage opens Saturday, plus upcoming construction and events that may impact service

Good afternoon!  Metro’s Friday afternoon commute begins quietly with no significant delays or disruptions in service to report.

Please note the information below about other service impacts in Metro’s service area.

Construction on Wallingford Av N between N 80th St and N 85th St

Mariners game tonight, Friday, August 26, 7:10 PM at Safeco Field
Traffic in the SODO, Stadium, Pioneer Square & downtown Seattle areas may be congested on game days.  Ride transit to the game.

SR-520 Evergreen Point Bridge – full weekend closure

The new Burien P&R garage opens on Saturday, August 27

  • The new 5 story, 460 space garage is on the west side of the Burien TC.
  • The Interim Burien P&R at 14650 1st Av S & the Burien Municipal Parking Lot will close on Saturday.

68th Av S will be closed at S 212th St

Seattle Marathon 10K

Enumclaw Motorcycle Show 

Sounders FC game Saturday, August 27 – 1:00 PM at CenturyLink Field
Although no Metro or Metro operated Sound Transit service is rerouted because of this event, expect possible delays due to traffic volumes in the SODO, Stadium, Pioneer Square & downtown Seattle areas.

Eastbound SW Spokane St at 26th Av SW will be closed

S 317th St between 23rd Av S and 28th Av S will be closed

Northbound Westlake Av N between Mercer St and Valley St
will be closed

Evergreen Point Bridge P&R on SR-520 has been moved to a new temporary location
As of July 25, Metro Transit’s Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.

  • This location will be used for about two years to allow for construction
    of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project.
  • The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Road & NE 32nd St in Medina.
  • Capacity at the temporary lot is reduced from 50 to 19 stalls.
  • When the new P&R opens in 2013, the 50 stall capacity will be restored.

The Mt Baker Link Station elevator to & from the southbound platform is out of service.  The northbound platform elevator is operating.

  • Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
  • Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train.

We are here until 7:00 PM this evening to help keep an Eye on Your Metro Commute.

Travel safely and have a great afternoon.

Metro’s Friday AM commute is winding down; the new Burien P&R garage opens Saturday, plus upcoming events that may affect transit service.

Metro’s Friday morning commute is winding down with
no significant delays to report.

Please note the information below about upcoming events in Metro’s service area.

Construction onWallingfordAv N betweenN 80th St&N 85th St- 8/23-27.

Mariners home stand – Starting Friday, 8/26, 7:10 PM at Safeco Field
Traffic in the SODO, Stadium, Pioneer Square & downtown Seattle areas may be congested on game days. Ride transit to the game.

SR-520 Bridge full weekend closure – Friday, 8/26 at 11 PM through Monday, 8/29 at 5 AM

The new Burien P&R garage opens on Saturday, 8/27

Enumclaw Motorcycle Show – Saturday, 8/27, 9:00 AM-8:00 PM

Seattle Marathon 10K – Saturday, 8/27, 7:30 AM-10:30 AM

Sounders FC game – Saturday, 8/27, 1 PM at CenturyLink Field
Although no Metro or Metro operated Sound Transit service is rerouted because of this event, expect possible delays due to traffic volumes in the SODO, Stadium, Pioneer Square & downtown Seattle areas.

Evergreen Point Bridge P&R on SR-520 has been moved to a new temporary location
As of July 25, Metro Transit’s Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.

  • This location will be used for about two years to allow for construction
    of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project.
  • The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Road & NE 32nd St inMedina.
  • Capacity at the temporary lot is reduced from 50 to 19 stalls.
  • When the new P&R opens in 2013, the 50 stall capacity will be restored.

The Mt Baker Link Station elevator to & from the southbound platform is out of service. The northbound platform elevator is operating.

  •  Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
  • Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train.

We will return at 3:00 PM to help keep an Eye on Your Metro Commute.

Travel safely and have a great morning.

Metro’s Friday AM commute begins quietly; the new Burien P&R garage opens Saturday, plus upcoming events that may affect transit service

Metro’s Friday morning commute begins quietly with no significant delays
or disruptions in transit service to report.

Please note the information below about upcoming events in Metro’s service area.

Construction onWallingfordAv N betweenN 80th St&N 85th St- 8/23-27.

Mariners home stand – Starting Friday, 8/26, 7:10 PM at Safeco Field
Traffic in the SODO, Stadium, Pioneer Square & downtown Seattle areas may be congested on game days. Ride transit to the game.

SR-520 Bridge full weekend closure – Friday, 8/26 at 11 PM through Monday, 8/29 at 5 AM

The new Burien P&R garage opens on Saturday, 8/27

Enumclaw Motorcycle Show – Saturday, 8/27, 9:00 AM-8:00 PM

Seattle Marathon 10K – Saturday, 8/27, 7:30 AM-10:30 AM

Sounders FC game – Saturday, 8/27, 1 PM at CenturyLink Field
Although no Metro or Metro operated Sound Transit service is rerouted because of this event, expect possible delays due to traffic volumes in the SODO, Stadium, Pioneer Square & downtown Seattle areas.

Evergreen Point Bridge P&R on SR-520 has been moved to a new temporary location
As of July 25, Metro Transit’s Evergreen Point Bridge P&R was moved to a new temporary location and the number of parking spaces was reduced.

  • This location will be used for about two years to allow for construction
    of the Washington State Department of Transportation’s (WSDOT)Eastside Transit & HOV Project.
  • The new temporary lot is located just north of the original P&R on the north side of SR-520 at Evergreen Point Road & NE 32nd St inMedina.
  • Capacity at the temporary lot is reduced from 50 to 19 stalls.
  • When the new P&R opens in 2013, the 50 stall capacity will be restored.

The Mt Baker Link Station elevator to & from the southbound platform is out of service. The northbound platform elevator is operating.

  •  Until repairs are made, southbound passengers who require the use of the elevator should ride instead north to Beacon Hill and transfer to a southbound train.
  • Southbound passengers who want to exit at Mt Baker should ride to Columbia City & transfer to a northbound train.

We will be here until 9:00 AM to help keep an Eye on Your Metro Commute.